Monday, April 21, 2014

WDW - Seven Dwarf’s Mine Coaster Update - 21/04/14

Seven Dwarf’s Mine Coaster - May 10, 2013
     More construction walls came down on the Storybook Circus side this week! The only side that still has some construction walls is the side across form the Winnie the Pooh ride. The walls are guarded but covered by pottered bushes. This is all a good sign that their will be a soft opening! Here are some pictures of what was behind the construction walls that were just torn down.

     As we can see in WDWMagic’s latest pictures the tracks seam to have some tape like coverings on some parts of the track those taps will not be their when the ride is running so they probably still  have about a week to two of work to be done on the tracks it seams like. Once the tracks have passed their inspection standards then they will probably move into testing the ride system!

   They have conducted test runs on the ride already but they probably want to do some more testing to make sure the timing of the show props, music, and effects are in sink with the rides movement. And I don’t believe they have started vigorously testing the ride system because they probably want the plants to catch root. Because the train cars running across the track cause vibrations in the ground  and allot of wind which is probably not good for the roots and plants when they are first starting out.

   So that is it for know about be sure to check back with me later to find out what happens next!

No comments:

Post a Comment